
This 250 mw tidal power plant is developed by the expert London’s marine energy developer. The prime phase of the eco system power plant is completed by two thousand thirteen and will then be scaled up to a two hundred fifty mega watt capacity at a price of about one hundred sixty-five million dollar.
The power energy generated by the eco system plant will be purchased by the GPCL (Gujarat power corporation limited), which targets to provide the traffic similar to what is being provided to maximum to maximum solar energy plants in the state.
250 mw tidal power plant
0 comments:
Post a Comment